Externally insulated masonry wall - CW006B

Dow Tuff-R or Dow Thermax LD Externally insulated masonry wall

Download CAD DWG

Download CAD PDF

Location
[Complete]

Material
Insulation
DOW Tuff-R or Dow Thermax LD

Total R-Value
[Complete]

Support & Fixing
Fit insulation board between brackets holding external cladding system frame, using two mechanical fixings per board and DCT recommended adhesive. Tape joints.

Flashings
Install flashings prior to installing board. Prevent entry of water behind the
insulation boards.

There are a large number of factors that need to be considered in assessing and managing condensation risk. Such factors include the local climate, building use, position, thickness and type of insulation, position and integrity of vapour barriers, and the degree and location of mechanical or passive ventilation. It is highly recommended that designers undertake a condensation risk analysis.

 